Pre Cooling

Boehringer Ingelheim, Bioggio 2008

At the Pharmaton facility in Lugano the first Nephos pre-cooling systems were installed. During the hottest days of the summer the air entering the condensers was cooled by more tha 15° C. Without the pre-cooling system the air-conditioners regularly failed.

On these peak days, Nephos provides the highest level of efficiency reducing consumption of energy ba 15-20 % and increasing the life of the air-conditioners by avoiding peaks.